Boeing - 787-9, Serial Number 39667 Aircraft Summary
Model | 787-9 Dreamliner |
Serial Number | 39667 |
Line Number | 692 |
Current / Last Operator | Etihad Airways |
Status | Active |
Date |
Detail |
Config |
Operator |
Reg |
Status |
2016-12-01 | Build Type - Production Standard | C28Y271 |
Etihad Airways |
A6-BLT |
On Order |
2016-12-01 | Assigned as ZB111 | C28Y271 |
Etihad Airways |
A6-BLT |
On Order |
2018-03-01 | Powered by General Electric Engines | C28Y271 |
Etihad Airways |
A6-BLT |
On Order |
2018-03-01 | Built at Everett | C28Y271 |
Etihad Airways |
A6-BLT |
On Order |
2018-03-01 | Entered Final Assembly | C28Y271 |
Etihad Airways |
A6-BLT |
On Order |
2018-03-18 | Rolled out (New Aircraft) | C28Y271 |
Etihad Airways |
A6-BLT |
On Order |
2018-03-28 | First Flight | C28Y271 |
Etihad Airways |
N1014X |
On Order |
2018-04-24 | New aircraft - Delivered to airline | C28Y271 |
Etihad Airways |
A6-BLT |
Active |
2024-05-23 | Aircraft maybe subject to issues with the Titanium fittings for the floor aft of the wing section where the floor meets the fuselage. Repairs approx cost is $400,000. | C28Y271 |
Etihad Airways |
A6-BLT |
Active |