Boeing - 787-9, Serial Number 39676 Aircraft Summary
Model | 787-9 Dreamliner |
Serial Number | 39676 |
Line Number | 768 |
Current / Last Operator | Etihad Airways |
Status | Active |
Date |
Detail |
Config |
Operator |
Reg |
Status |
2018-09-14 | Build Type - Production Standard | C28Y271 |
Etihad Airways |
A6-BLV |
On Order |
2018-09-14 | Built at Everett | C28Y271 |
Etihad Airways |
A6-BLV |
On Order |
2018-09-14 | Powered by General Electric Engines | C28Y271 |
Etihad Airways |
A6-BLV |
On Order |
2018-09-14 | Entered Final Assembly | C28Y271 |
Etihad Airways |
A6-BLV |
On Order |
2018-09-14 | Assigned as ZB113 | C28Y271 |
Etihad Airways |
A6-BLV |
On Order |
2019-09-10 | First Flight | W56Y282 |
Etihad Airways |
A6-BLV |
On Order |
2019-10-09 | Rolled out (New Aircraft) | W56Y282 |
Etihad Airways |
A6-BLV |
On Order |
2019-11-21 | New aircraft - Delivered to airline | W56Y282 |
Etihad Airways |
A6-BLV |
Active |
2019-12-01 | Painted in Abu Dhabi F1 Livery | W56Y282 |
Etihad Airways |
A6-BLV |
Active |
2024-05-23 | Aircraft maybe subject to issues with the Titanium fittings for the floor aft of the wing section where the floor meets the fuselage. Repairs approx cost is $400,000. | W56Y282 |
Etihad Airways |
A6-BLV |
Active |