Boeing - 787-10, Serial Number 60757 Aircraft Summary
Model | 787-10 Dreamliner |
Serial Number | 60757 |
Line Number | 770 |
Current / Last Operator | Etihad Airways |
Status | Active |
Date |
Detail |
Config |
Operator |
Reg |
Status |
2016-12-01 | Build Type - Production Standard | C32Y304 |
Etihad Airways |
A6-BMC |
On Order |
2016-12-01 | Assigned as ZC063 | C32Y304 |
Etihad Airways |
A6-BMC |
On Order |
2018-09-25 | Built at Charleston | C32Y304 |
Etihad Airways |
A6-BMC |
On Order |
2018-09-25 | Powered by General Electric Engines | C32Y304 |
Etihad Airways |
A6-BMC |
On Order |
2018-09-25 | Entered Final Assembly | C32Y304 |
Etihad Airways |
A6-BMC |
On Order |
2018-10-13 | Rolled out (New Aircraft) | C32Y304 |
Etihad Airways |
A6-BMC |
On Order |
2018-11-29 | First Flight | C32Y304 |
Etihad Airways |
A6-BMC |
On Order |
2018-12-06 | New aircraft - Delivered to airline | C32Y304 |
Etihad Airways |
A6-BMC |
Active |
2019-05-23 | Issues with the electrical systems caused flight EY-22 to be delayed whilst repairs where undertaken to the navigation system electric feeds | W56Y282 |
Etihad Airways |
A6-BMC |
Active |
2024-05-23 | Aircraft maybe subject to issues with the Titanium fittings for the floor aft of the wing section where the floor meets the fuselage. Repairs approx cost is $400,000. | W56Y282 |
Etihad Airways |
A6-BMC |
Active |