Boeing - 787-9, Serial Number 62728 Aircraft Summary
Model | 787-9 Dreamliner |
Serial Number | 62728 |
Line Number | 841 |
Current / Last Operator | Hainan Airlines |
Status | Active |
Date |
Detail |
Config |
Operator |
Reg |
Status |
2016-12-01 | Build Type - Production Standard | C26W21Y247 |
Hainan Airlines |
B-20AL |
On Order |
2016-12-01 | Assigned as ZB805 | C26W21Y247 |
Hainan Airlines |
B-20AL |
On Order |
2019-03-11 | Entered Final Assembly | C26W21Y247 |
Hainan Airlines |
B-20AL |
On Order |
2019-03-11 | Powered by General Electric Engines | C26W21Y247 |
Hainan Airlines |
B-20AL |
On Order |
2019-03-11 | Built at Everett | C26W21Y247 |
Hainan Airlines |
B-20AL |
On Order |
2019-03-26 | Rolled out (New Aircraft) | C26W21Y247 |
Hainan Airlines |
B-20AL |
On Order |
2019-04-16 | First Flight | C26W21Y247 |
Hainan Airlines |
B-20AL |
On Order |
2019-06-06 | Ferried to Charleston | W56Y282 |
Hainan Airlines |
B-20AL |
On Order |
2019-06-28 | New aircraft - Delivered to airline | W56Y282 |
Hainan Airlines |
B-20AL |
Active |
2024-05-23 | Aircraft maybe subject to issues with the Titanium fittings for the floor aft of the wing section where the floor meets the fuselage. Repairs approx cost is $400,000. | W56Y282 |
Hainan Airlines |
B-20AL |
Active |