Boeing - 787-9, Serial Number 64217 Aircraft Summary
Model | 787-9 Dreamliner |
Serial Number | 64217 |
Line Number | 909 |
Current / Last Operator | Qatar Airways |
Status | Active |
Date |
Detail |
Config |
Operator |
Reg |
Status |
2019-01-01 | Build Type - Production Standard | C30Y281 |
Qatar Airways |
A7-BHA |
On Order |
2019-01-01 | Assigned as ZB937 | C30Y281 |
Qatar Airways |
A7-BHA |
On Order |
2019-08-02 | Entered Final Assembly | W56Y282 |
Qatar Airways |
A7-BHA |
On Order |
2019-08-02 | Powered by General Electric Engines | W56Y282 |
Qatar Airways |
A7-BHA |
On Order |
2019-08-02 | Built at Everett | W56Y282 |
Qatar Airways |
A7-BHA |
On Order |
2019-08-19 | Rolled out (New Aircraft) | W56Y282 |
Qatar Airways |
A7-BHA |
On Order |
2019-09-04 | First Flight | W56Y282 |
Qatar Airways |
A7-BHA |
On Order |
2019-10-22 | Delivery delayed due to Q-Suite installation delays | W56Y282 |
Qatar Airways |
A7-BHA |
Stored |
2019-11-28 | Delivery due in early-mid December 2019 | W56Y282 |
Qatar Airways |
A7-BHA |
Stored |
2019-12-20 | New aircraft - Delivered to airline | W56Y282 |
Qatar Airways |
A7-BHA |
Active |
2019-12-28 | Returned to Boeing for cabin fitting | W56Y282 |
Qatar Airways |
A7-BHA |
Stored |
2020-09-14 | Stored at Doha | W56Y282 |
Qatar Airways |
A7-BHA |
Stored |
2020-12-26 | Re-Delivered to Airlines | W56Y282 |
Qatar Airways |
A7-BHA |
Active |
2024-05-23 | Aircraft maybe subject to issues with the Titanium fittings for the floor aft of the wing section where the floor meets the fuselage. Repairs approx cost is $400,000. | W56Y282 |
Qatar Airways |
A7-BHA |
Active |