Boeing - 787-9, Serial Number 66162 Aircraft Summary
Model | 787-9 Dreamliner |
Serial Number | 66162 |
Line Number | 1043 |
Current / Last Operator | Shanghai Airlines |
Status | Active |
Date |
Detail |
Config |
Operator |
Reg |
Status |
2019-11-06 | Build Type - Production Standard | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
On Order |
2019-11-06 | Assigned as ZB904 | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
On Order |
2019-11-06 | Built at Charleston | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
On Order |
2020-07-22 | Entered Final Assembly | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
On Order |
2020-07-22 | Powered by General Electric Engines | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
On Order |
2020-08-12 | Rolled out (New Aircraft) | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
On Order |
2020-09-17 | First Flight | F4C26W28Y227 |
Shanghai Airlines |
N1789B |
Production Testing |
2022-06-01 | Entered Production Testing | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
On Order |
2024-01-08 | Stored at Victorville | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
Stored |
2024-01-28 | Ferried to Charleston for Production Testing | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
Production Testing |
2024-05-23 | Aircraft maybe subject to issues with the Titanium fittings for the floor aft of the wing section where the floor meets the fuselage. Repairs approx cost is $400,000. | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
Production Testing |
2024-09-16 | Entered re-work | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
Re-Works |
2024-10-01 | Stored | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
Stored |
2024-10-01 | Ready for Delivery | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
Ready for Delivery |
2024-10-19 | New aircraft - Delivered to airline | F4C26W28Y227 |
Shanghai Airlines |
B-20EV |
Active |