Boeing - 787-9, Serial Number 66078 Aircraft Summary
Model | 787-10 Dreamliner |
Serial Number | 66078 |
Line Number | 1052 |
Current / Last Operator | Eva Air |
Status | Active |
Date |
Detail |
Config |
Operator |
Reg |
Status |
2020-08-13 | Build Type - Production Standard | C34Y308 |
Eva Air |
B-17808 |
On Order |
2020-08-13 | Entered Final Assembly | C34Y308 |
Eva Air |
B-17808 |
On Order |
2020-08-13 | Powered by General Electric Engines | C34Y308 |
Eva Air |
B-17808 |
On Order |
2020-08-13 | Assigned as ZC239 | C34Y308 |
Eva Air |
B-17808 |
On Order |
2020-08-13 | Built at Charleston | C34Y308 |
Eva Air |
B-17808 |
On Order |
2020-09-01 | Rolled out (New Aircraft) | C34Y308 |
Eva Air |
B-17808 |
On Order |
2020-12-04 | First Flight | C34Y308 |
Eva Air |
B-17808 |
On Order |
2023-04-08 | Entered Production Testing | C34Y308 |
Eva Air |
B-17808 |
On Order |
2023-12-13 | New aircraft - Delivered to airline | C34Y308 |
Eva Air |
B-17808 |
Active |
2024-05-23 | Aircraft maybe subject to issues with the Titanium fittings for the floor aft of the wing section where the floor meets the fuselage. Repairs approx cost is $400,000. | C34Y308 |
Eva Air |
B-17808 |
Active |